WK4- PSC FOCUS – OWS SAMPLE LINE VALVE ASSESSMENT
Inspection procedures and the criteria for compliance and non-compliance are explained based onthe piping configuration of the sample line leading to the 15ppm bilge alarm. Inspection Procedures and Criteria for Compliance and Non-Compliance AA) Where Valve X and/or Union joint is sealed (Refer to Figure 1) PSC will confirm compliance […]
Read more