MACHINERY PLANNED MAINTENANCE

Major Scheme Updates You Need to Know The framework governing how machinery maintenance is planned, monitored, and surveyed aboard vessels is undergoing a significant overhaul. From new survey codes to streamlined documentation, the updates aim to modernise the process and reduce administrative burden on ship operators — here’s what you […]

Read more

SIRE 2.0 – WK : 61 | INSPECTION EXPERIENCE

Port: Algeciras, SpainInspection Date: June 2026Inspector: An…. Inspector’s Overall Style The inspection lasted almost the entire day and was very evidence-driven. The inspector rarely accepted verbal answers alone and almost every discussion ended with requests such as: Bridge, Engine and Cargo departments were all inspected in detail. Random crew interviews […]

Read more

WK 19 : PSC APPEAL SUCCESS SUMMARY

How from code 30 to code 17 Ground for detention The ship was detained due to the following detainable deficiency: 05118 Operation of GMDSS equipment – SECOND OFFICER NOT FAMILIAR WITH THE OPERATION OF THE GMDSS RADIO So it was decided to appeal with MOU Dispute .1 The Convention reference […]

Read more

SIRE 2.0- WK : 60 – PRE-SIRE 2.0 INSPECTION REPORT

At Sea – During Sailing with onboard crew No of days: 3 Vessel Pre-SIRE Inspection Summary Inspection Objective A comprehensive Pre-SIRE 2.0 inspection was carried out to assess the vessel’s readiness for an upcoming Chevron OCIMF SIRE 2.0 inspection. Overall Outcome Achieved Positive Outcomes ✅ Officers demonstrated good knowledge of […]

Read more