Category: SIRE 2.0
ESP – What to know about ESP for SIRE 2.0 ?
Week 49 CH 2.3.1 : Were the Master and Chief Engineer familiar with the procedure to maintain the Enhanced Survey File in accordance with the Classification Society Rules, and was the vessel free of any visible or documentary evidence of concerns with the structural condition of the hull or cargo […]
Read moreWK 48 – Focus Inspection Campaign by OCIMF
Vessel Hardening Plan One of the question categories in SIRE 2.0 is the campaign type. Under this, OCIMF carried out a Focused Inspection Campaign (FIC), and the findings are as follows: Earlier, most findings were about things you could see — missing barriers, unsecured access points, incomplete arrangements. Today, those […]
Read moreWK 47 – SIRE 2.0 – HE CHECKED EVERYTHING
SIRE 2.0 Inspection Experience – February 2026 Inspector: Ma###or #a#d#Oil Major: Shell Inspection Flow – As Experienced Onboard The inspector, boarded the vessel and after the initial gangway formalities, proceeded directly to the Master’s office. Opening Meeting He started with a brief opening meeting with the ship’s management team.He explained […]
Read moreSIRE 2.0 WK 45 – WHERE IS YOUR LAST ONE YEAR DEFECT LIST?
SIRE Inspection Experience – Feb 2026 Inspector: Capt. Md. Sha….. Oil Major: INEOS Capt. Md. Sha… boarded vessel and after initial gangway briefing proceeded to Master’s office. Opening Meeting Opening meeting conducted with ship management team. Inspector explained scope of inspection and advised he will check equipment and procedures in […]
Read moreWK 44- SIRE 2.0 ANNUAL STATISTICS 2025
Watch explanation video GENERAL OVERVIEW This report outlines an overview of the data collected from 2025. For the period 1 January 2025 – 31 December 2025, 108 Members have been participating, uploading a total of 7,241 Reports. The number of average negative observations is 5.24, which marks an improvement over […]
Read moreLive SIRE 2.0 : What Inspectors Really Check from Ulsan
We are carrying out SIRE 2.0 Training, For Booking please visit : https://marinersupdate.com/training.html SIRE INSPECTION AT ULSAN: Inspector name: Capt. Y******* OPENING MEETING Inspection checklist given to ship staff and discussed scope and topics to be cover during inspection all area which are to be checked need to well ventilated […]
Read more








